Electrical Platform
Apex Electrical Beta
An electrical operations shell for service work, permits, and estimate discipline.
Electrical now has a protected beta workspace for inbound jobs, permits, estimating, and code-sensitive follow-through. It is a real shell that stays honest about how early the vertical still is.
Electrical now has a protected beta workspace shell plus a staged public lander. It is still not a certified self-serve vertical because needs field/job intake and service workflow proof before public rollout.
Best way to join Electrical Platform
Use the page to understand the workflow, then join the waitlist while Apex tightens the standalone flow behind the scenes.
See what the wedge already does well
Join the waitlist or request access
We will unlock it when the standalone flow is ready
Founder Seat
Need Electrical rolled out as a premium founder lane?
Pay $25,000 upfront for the white-glove Apex path: implementation planning, migration support, priority roadmap sessions, and direct launch help while the broader self-serve wedge keeps tightening.
$25,000 one-time
High-touch rollout
Priority onboarding
Not equity
Founder seat access is a premium implementation and priority-access package. It is not equity, a revenue share, or an investment product.
First workflow
Service request intake -> estimate -> permit/job follow-through.
Intake truth
Electrical still needs trusted service-request intake, estimate persistence, and permit/job-state writes before it is a true self-serve trade platform.
Workspace truth
The electrical dashboard is now a real authenticated beta workspace shell, but it remains an operator-review surface until dispatch, permits, and job events are real.
Empty-state rule
If no jobs or estimates have been connected yet, the shell must remain honestly empty.
Beta tool pages
4
Publicly packaged wedges inside the electrical family.
First workflow
Service request intake -> estimate -> permit/job follow-through.
Public story and workspace shell now agree on the first believable wedge.
Commercial truth
Inventory only
0 direct self-serve tools. Everything else stays waitlist-first until the workflow tightens.
Family workflow standard
This is the horizontal lesson from real estate: start each vertical with one believable workflow, keep intake truth explicit, keep the blank state honest, and do not market CHUM or automation loops that are not runtime-certified yet.
First workflow
Service request intake -> estimate -> permit/job follow-through.
Intake truth
Electrical still needs trusted service-request intake, estimate persistence, and permit/job-state writes before it is a true self-serve trade platform.
Empty-state rule
If no jobs or estimates have been connected yet, the shell must remain honestly empty.
CHUM truth
CHUM can eventually reward estimate speed, permit saves, and fast callback recovery, but those events are still planned for this vertical.
Beta
Load Calc
$9/mo current beta SKU
Run quick load-calculation workflows and keep estimate prep from becoming a scattered manual process.
Lead-magnet role: Wins the electrical family through a concrete technical wedge, then expands into permitting and material planning.
Certification: Public beta page and protected apex electrical beta workspace shell exist. Billing inventory is mapped, but the standalone operational data contract is not yet certified.
Commercial status: Inventory only.
Best way to join Load Calc
Use the page to understand the workflow, then join the waitlist while Apex tightens the standalone flow behind the scenes.
Fast technical wedge with obvious value
Supports estimate confidence
Great entry point into the electrical beta family
Beta
Permit Tracker
$9/mo current beta SKU
Watch permit pressure and keep jobs from stalling on missing approvals or forgotten next steps.
Lead-magnet role: Builds trust through operational control, then broadens into the wider job workflow.
Certification: Public beta page and protected apex electrical beta workspace shell exist. Billing inventory is mapped, but the standalone operational data contract is not yet certified.
Commercial status: Inventory only.
Best way to join Permit Tracker
Use the page to understand the workflow, then join the waitlist while Apex tightens the standalone flow behind the scenes.
Keeps permit blockers visible
Supports smoother job progression
Pairs naturally with code and material planning
Beta
Material Estimator
$9/mo current beta SKU
Estimate material needs, surface missing items, and keep job prep from turning reactive.
Lead-magnet role: Pulls in margin-sensitive operators through a practical planning wedge that feels instantly useful.
Certification: Public beta page and protected apex electrical beta workspace shell exist. Billing inventory is mapped, but the standalone operational data contract is not yet certified.
Commercial status: Inventory only.
Best way to join Material Estimator
Use the page to understand the workflow, then join the waitlist while Apex tightens the standalone flow behind the scenes.
Improves prep before jobs go live
Helps catch material blockers early
Strengthens the estimating-to-execution story
Beta
Code Check
$9/mo current beta SKU
Surface code-related follow-up and keep compliance pressure from hiding in notes and memory.
Lead-magnet role: Adds a trust-centered wedge that makes the electrical family feel more serious and more governed.
Certification: Public beta page and protected apex electrical beta workspace shell exist. Billing inventory is mapped, but the standalone operational data contract is not yet certified.
Commercial status: Inventory only.
Best way to join Code Check
Use the page to understand the workflow, then join the waitlist while Apex tightens the standalone flow behind the scenes.
Brings code pressure into the workflow
Improves trust without pretending full automation
Raises the seriousness of the electrical beta family